Bathemetry survey was carried oud to determine sedimentations and silts. In 2022, flowback was experienced on the Kanjy HPP spill way area. Bathemetry and positiong fixing afloat was conducted for remiddial works
Topographical Survey
The PGM-EEMS Limited
Conduct the topographic survey of the compressor site locations, including a 10m fire break extension. Establishment of Horizontal and Vertical survey controls by GPS Methodology.
Topographical Survey
CPCS Transcom Nigeria Limited
Topographical Survey of 36km BRT from Eagle Square-Abuja to Tudu Wada in Nasarawa State.
Topographic Survey
Sieyuan Electric (Nigeria) Co., Ltd
Topographic Survey of about 5km 132kV Underground XLPE Cable from New Apo Substation to Wumba/ Lokogoma Substation.